Gerui supports importers, distributors, private-label brands, and purchasing teams sourcing standard replacement steering and suspension parts from China. The starting point is a defined vehicle application and bill of materials, followed by supplier evidence and commercial terms that can be compared on the same basis.
Built for B2B range development
This program is for buyers building or replenishing a product range. It is not a retail fitment service and does not treat a model name or catalog photograph as sufficient proof of application.
Steering and suspension sourcing scope
The initial range focuses on four repeatable repair and purchasing scopes. Each quotation identifies the exact parts included, position, quantity per vehicle, application reference, available evidence, packaging basis, MOQ, lead time, and unresolved points.
Lower control arm sets
Upper control arm sets
Stabilizer link and bushing kits
Vehicle programs for Australian aftermarket buyers
Application-led pages help separate model generations, build phases, drivetrains, steering configurations, and special chassis options before a supplier quote is accepted. The first validation group covers popular pickups and SUVs in the Australian aftermarket.
Ford Ranger PX steering and suspension
Toyota Hilux N70 steering and suspension
Toyota Prado J150 steering and suspension
Mitsubishi Triton MQ / MR steering and suspension
Information required before fitment review
| Data group | What to send | Why it matters |
|---|---|---|
| Vehicle identity | Make, model, build month, chassis code, destination market, and VIN last eight characters when available. | Separates model phases and market-specific applications. |
| Configuration | RHD or LHD, 2WD or 4WD, engine or drivetrain details, ride-height configuration, and relevant chassis options. | Reduces the risk of treating visually similar parts as interchangeable. |
| Part identity | OE number, current supplier code, side, axle, inner or outer position, drawing, dimensions, or sample reference. | Creates a traceable comparison point for the selected component. |
| Commercial scope | Quantity by item, destination, packaging, label or barcode requirements, Incoterm, and target timing. | Allows MOQ, price, packing, lead time, and freight basis to be compared. |
What a comparable supplier quotation should contain
A low unit price is not comparable when the application, kit contents, material, inspection, packaging, or warranty basis is different. Gerui structures enquiries around four linked records:
- Application record: vehicle, build range, chassis, drivetrain, steering configuration, position, OE references, and source history.
- Kit BOM: component name, left or right side, quantity, boots, clamps, nuts, bushings, joints, mounting hardware, and packaging unit.
- Product evidence: drawing, key dimensions, material statement, available reports, sample status, batch marking, inspection criteria, and traceability.
- Commercial record: price basis, MOQ, lead time, packing method, Incoterm, warranty terms, claim process, and quotation validity.
Private-label and mixed-SKU supply planning
Neutral packaging, buyer-brand packaging, labels, barcodes, carton protection, and mixed-SKU consolidation can be reviewed during quotation. Availability and cost depend on the selected factory, product, order quantity, artwork, production status, and shipment plan. These options are confirmed in writing for each project.
From buying list to trial order
- Send the source data. Share OE numbers, vehicle details, current references, drawings, samples, or an existing buying list.
- Close application gaps. Separate model phases, positions, sides, configurations, and uncertain cross-references.
- Define the product and BOM. Record dimensions, material questions, included hardware, packaging, and inspection points.
- Compare supply routes. Review available evidence, sample status, MOQ, lead time, price basis, traceability, and claim terms.
- Approve the commercial scope. Keep confirmed facts and open conditions visible before sample or trial-order payment.
Common buyer questions
Can Gerui quote from an OE number?
An OE number is a useful starting point. Vehicle configuration, position, build period, dimensions, and the source of the cross-reference may still be required before approval.
Can different steering and suspension parts be combined?
Mixed-SKU planning is reviewed against each supplier’s MOQ, production status, packaging compatibility, timing, and consolidation route.
Do you provide a fitment guarantee?
Fitment is reviewed from the information and evidence available for the quoted item. Gerui does not publish a blanket fitment guarantee before the specific application, supplier evidence, sample, and commercial terms are confirmed.
Can you supply private-label packaging?
Private-label requirements are quoted after the packaging specification, artwork, label or barcode data, quantity, cost, and lead time are confirmed.
Prepare a steering and suspension RFQ
Send the vehicle data, OE references, required parts, quantity by item, packaging requirement, and destination. We will return the missing fitment questions and a defined quotation scope.